What Is an Asbestos Clearance Certificate? A Guide for Cape Town Property Owners

An asbestos clearance certificate is the written declaration an approved inspection authority issues after asbestos removal or encapsulation, once it has inspected the area, taken air samples and confirmed that all the asbestos waste has gone. It shows the work area is clear, and it belongs with your building records.

Written by the Roof Direct team and reviewed by Andre Smit, who runs Roof Direct and has more than 20 years in roofing and waterproofing. Published .

20+ years' experienceOwner-led by Andre Smit, with our foreman, Randall Swarts: both have more than 20 years in the trade
Free inspection and quoteUsually within 48 hours, with an itemised quote and photos of what we found
Guaranteed workmanshipA 2-year workmanship guarantee on most work, plus the manufacturer's guarantee on materials
Safety-file readyWorking-at-heights compliant teams; safety files for larger projects

What is an asbestos clearance certificate?

An asbestos clearance certificate is the final document of an asbestos removal or encapsulation project. It’s a written declaration, issued by an approved inspection authority, that the work area has been inspected, that the air has been sampled and meets the clearance standard, and that all the asbestos waste has been removed. Until it’s issued, the area isn’t formally handed back.

If you own a factory, manage a sectional title complex or have just had an asbestos roof removed from your home, this is the document that shows the job was done properly. It sits alongside the plan of work and the disposal certificate in your building records.

This guide is general information, not legal advice. The official text of the Asbestos Abatement Regulations, 2020 is published by the Department of Employment and Labour.

Who issues it?

An approved inspection authority, which is independent of the contractor that did the work. That independence is the point: the people who removed the asbestos don’t get to sign off their own job.

Before Type 2 asbestos work starts, the client appoints the approved inspection authority in writing (regulation 11). The inspection authority is involved from the start. It works with the registered asbestos contractor on the plan of work, submits it before the work begins, monitors the air during the job, and carries out the clearance at the end.

When do you need one?

You need a clearance certificate after Type 2 asbestos work, which covers:

  • removal of asbestos cement products, such as roof sheets, gutters and fascias, and asbestos insulating board ceilings
  • repair or encapsulation of asbestos cement without surface preparation

Regulation 11(3) puts the responsibility on the client: after the work is complete, the asbestos client must obtain the clearance certificate from the approved inspection authority. In practice, your contractor and the inspection authority arrange it, but it’s worth knowing that it’s your document to ask for.

Small jobs classed as Type 1, such as painting asbestos cement without any surface preparation, don’t carry the same clearance requirement. If you’re not sure how a job is classed, the regulations say an approved inspection authority or the Chief Inspector decides.

What does the inspector check?

Regulation 22 sets out what the approved inspection authority must do before issuing the clearance:

  1. A thorough visual inspection of the work area, looking for any remaining asbestos debris or dust.
  2. Air sampling to confirm that the airborne fibre level meets the clearance indicator set by the regulations.
  3. A check that all asbestos waste has been removed and handled according to the disposal rules in regulation 21.
  4. A written declaration for clearance certification, which is the certificate you keep.

If the area doesn’t pass, it isn’t cleared. The remaining issue has to be dealt with and the area checked again before the certificate can be issued.

The other documents you should receive

A clearance certificate is one of several documents from an asbestos project. Keep them together:

  • The plan of work, which you co-sign before the job starts. It names everyone involved and sets out how the work will be done.
  • The disposal certificate from the designated asbestos disposal site, confirming that your waste was received there.
  • The clearance certificate from the approved inspection authority.

Regulation 23 requires employers to keep clearance certificates, disposal certificates and other asbestos records for at least 50 years. For workplaces, the asbestos inventory should also be updated once material has been removed or encapsulated. Our guide Do I have to remove my asbestos roof? explains the inventory and the other owner duties.

Why it matters when you sell, insure or renovate

A clearance certificate is the easiest way to show that asbestos was removed properly. Buyers, their inspectors and future contractors may ask for it, and body corporates should keep it on file for the trustees who come after them. If you’re buying a property where asbestos was removed, ask for the clearance and disposal certificates as part of the paperwork.

How it works on our projects

On our asbestos projects, the removal or encapsulation is carried out by our sister company, Indi Maintenance Services, a Registered Asbestos Contractor (Type 2), certificate 2025RAC/CI-180, valid until 26 August 2028. An approved inspection authority is appointed for every job, and the plan of work, disposal certificate and clearance certificate carry Indi’s name. Roof Direct inspects and coordinates the whole project, quotes and installs your new roof or ceiling, and makes sure you receive every document before we close the job. Indi quotes the asbestos work itself.

See how a project runs on our asbestos services page, or read about asbestos roof removal and asbestos ceiling removal.

If you have an asbestos roof or ceiling and want to understand your options, request a free inspection. We’ll explain the process and the paperwork in plain terms before anything starts.

Frequently asked questions

Who issues an asbestos clearance certificate?

An approved inspection authority issues it, not the contractor who did the work. The client appoints the inspection authority in writing before asbestos removal or encapsulation starts, and the same authority monitors the air during the job. Once the work is finished, it inspects the area, takes air samples and issues the written declaration that the area is clear.

Do I need a clearance certificate after asbestos roof removal?

Yes. After asbestos removal, encapsulation or repair carried out by a registered contractor, regulation 11(3) says the asbestos client must obtain a clearance certificate from the approved inspection authority. It's the proof that the job was finished properly and the area was safe to hand back, so make sure you receive it before you consider the project closed.

Is a clearance certificate needed after painting an asbestos roof?

Not usually. The 2020 regulations require a clearance certificate after Type 2 work, such as removal, repair or encapsulation. Painting asbestos cement without any surface preparation and without releasing fibres is classed as Type 1 work, which has no clearance requirement. If a coating job is classed as encapsulation instead, it becomes Type 2 work, and a clearance certificate applies.

How long should I keep an asbestos clearance certificate?

Keep it permanently with your building records. Regulation 23 requires employers to keep clearance certificates, disposal certificates and other asbestos records for at least 50 years. Homeowners aren't bound in the same way, but the certificate is useful when you sell, insure or renovate, so store it with your title deeds and plans, and hand a copy to the next owner.

What is the difference between a clearance certificate and a disposal certificate?

A clearance certificate confirms that the work area is clear after the asbestos work, based on an inspection and air sampling by the approved inspection authority. A disposal certificate comes from the registered disposal site and confirms that the asbestos waste from your job was received there. You should get both after an asbestos removal project, and keep them together.